LIB salt fog and SO2 corrosion chamber exposes sample to a series of different environment conditions that combining salt spray with temperature, humidity, SO2 gas, drying, wetting and more. Suitable for testing to standards including; ASTM B117, ISO 9002, IEC60068 and ASTM G85.
The SO₂ gas concentration is monitored in real time, with ±0.1 % FS accuracy, while the chamber supports test durations from 4 up to 21 days, providing reliable data for coatings, metals, plastics, and electronic components.Suitable for testing to standards including; ASTM B117, ISO 9002, IEC60068 , ISO 11997nd ASTM G85.
SSC-010/ SSC-016/ SSC-020
LIB Industry
| Availability: | |
|---|---|
| Quantity: | |
ASTM G85 Annex 4 (A4) is a corrosion test which introduces SO2 gas directly into the salt spray chamber according to specified cycles. SSC chambers are upgraded to programmable controller and Ethernet access. All models are automated, and can working continuously. various models can meet different test requirements.
Advantages
1. Precise Multi-Parameter Control: The chamber allows simultaneous control of temperature (+10 ℃ to +90 ℃), humidity (30 %–98 % RH), and SO₂ gas concentration (25 ± 5 ppm). Integrated PID sensors and real-time monitoring ensure deviations remain within ±0.5 ℃, ±1 % RH, and ±0.1 % FS, providing accurate, repeatable testing conditions for coatings, metals, and plastics.
2. Flexible Test Duration and Protocols: Users can run short-term or extended corrosion tests ranging from 4 to 21 days, with up to 120 programmable profiles and 100-step sequences. Preloaded programs allow quick test setup, while custom sequences support complex industrial standards testing, reducing operator time and increasing lab efficiency.
3. Robust Construction for Harsh Conditions: The workroom is made of glass-fiber reinforced plastics resistant to SO₂, salt, and high humidity, while the exterior A3 steel frame with electrostatic coating ensures long-term durability. Pneumatic seals and double-sealed doors maintain integrity during continuous operation, protecting both the chamber and the laboratory environment.
4. Comprehensive Safety Features: Equipped with dry-combustion protection, over-temperature and over-current shutdown, water shortage sensors, and a fail-safe electromagnetic door lock, the chamber ensures safe operation under extreme corrosive environments, minimizing risk to personnel and samples.
5. Efficient Salt and Gas Delivery Systems: The adjustable spray tower, quartz nozzles, and brine stirring system maintain uniform salt fog deposition at 1–2 ml/80 cm²·h. The integrated SO₂ exhaust device safely neutralizes emissions, while the centrifugal fan ensures even circulation, guaranteeing consistent exposure across all samples.
Specification For Salt Fog and SO2 Corrosion Chamber
| Model | SSC-010 | SSC-016 | SSC-020 |
| Internal dimensions (mm) | 800*1450*680 | 1000*1600*800 | 1000*2000*900 |
| Overall dimensions (mm) | 2600×1400×1650 | 2750*1600*1800 | 3150*1600*2100 |
| Interior Volume (L) | 780 | 1280 | 1800 |
| Temperature Range | +10 ℃ ~ +90 ℃ | ||
| Temperature Fluctuation | ± 0.5 ℃ | ||
| Temperature Deviation | ± 2.0 ℃ | ||
| Humidity Range | 30% ~ 98% RH | ||
| Humidity Deviation | + 2%, - 3% | ||
| Salt Fog Deposition | 1~2ml / 80cm2 · h | ||
| SO2 Gas Control | Control and display volume of SO2 gas | ||
| Cooling system | Mechanical compression refrigeration system | ||
| Humidifier | External isolation, stainless steel surface evaporation humidifier | ||
| Air Preheating | Saturated air barrel | ||
| Spraying System | Atomizer tower and Spray nozzles | ||
| Salt Fog Collected | Fog collector and fog measure cylinder | ||
| Sealing | Pneumatic seal | ||
| Controller | Programmable color LCD touch screen controller, Ethernet connection | ||
| Air Circulation | Centrifugal wind fan | ||
| SO2 Exhaust Device | NAOH tank | ||
| Safety Device | Humidifier Dry-combustion Protection; Over-temperature Protection; Over-current Protection; | ||
| Water Shortage Protection; Earth leakage Protection | |||
| Material | Glass fiber reinforced plastics | ||
| Standard Configuration | 8 round bars and 7 V-shaped grooves | ||
Operate Guide of the Salt Fog and SO2 Corrosion Chamber
Before starting, ensure the chamber is installed on a level surface with adequate clearance. Fill the external salt solution tank with prepared brine and verify the water purification system is functional. Use the PID programmable touchscreen controller to select or create the desired test program, set temperature, humidity, SO₂ concentration, and test duration, then start the cycle. Monitor test conditions via the built-in sensors and observation window, and ensure the SO₂ exhaust system is active when the test completes. Always follow safety guidelines, including avoiding flammable or highly corrosive substances, and check that the electromagnetic door lock is engaged before operation.
Video of the Salt Fog and SO2 Corrosion Chamber
Global Assistance You Can Rely On
LIB ensures complete confidence with a 3-year warranty and ongoing lifetime technical guidance. If any issue arises that cannot be resolved on-site, the test chamber will be replaced at no cost. Our expert English-speaking support team is available 24/7 to provide prompt assistance worldwide. Critical spare parts are stocked in international distribution centers for delivery within 7–15 days, and detailed instructions are provided to guarantee safe shipping, installation, and operation of the equipment.
ASTM G85 Annex 4 (A4) is a corrosion test which introduces SO2 gas directly into the salt spray chamber according to specified cycles. SSC chambers are upgraded to programmable controller and Ethernet access. All models are automated, and can working continuously. various models can meet different test requirements.
Advantages
1. Precise Multi-Parameter Control: The chamber allows simultaneous control of temperature (+10 ℃ to +90 ℃), humidity (30 %–98 % RH), and SO₂ gas concentration (25 ± 5 ppm). Integrated PID sensors and real-time monitoring ensure deviations remain within ±0.5 ℃, ±1 % RH, and ±0.1 % FS, providing accurate, repeatable testing conditions for coatings, metals, and plastics.
2. Flexible Test Duration and Protocols: Users can run short-term or extended corrosion tests ranging from 4 to 21 days, with up to 120 programmable profiles and 100-step sequences. Preloaded programs allow quick test setup, while custom sequences support complex industrial standards testing, reducing operator time and increasing lab efficiency.
3. Robust Construction for Harsh Conditions: The workroom is made of glass-fiber reinforced plastics resistant to SO₂, salt, and high humidity, while the exterior A3 steel frame with electrostatic coating ensures long-term durability. Pneumatic seals and double-sealed doors maintain integrity during continuous operation, protecting both the chamber and the laboratory environment.
4. Comprehensive Safety Features: Equipped with dry-combustion protection, over-temperature and over-current shutdown, water shortage sensors, and a fail-safe electromagnetic door lock, the chamber ensures safe operation under extreme corrosive environments, minimizing risk to personnel and samples.
5. Efficient Salt and Gas Delivery Systems: The adjustable spray tower, quartz nozzles, and brine stirring system maintain uniform salt fog deposition at 1–2 ml/80 cm²·h. The integrated SO₂ exhaust device safely neutralizes emissions, while the centrifugal fan ensures even circulation, guaranteeing consistent exposure across all samples.
Specification For Salt Fog and SO2 Corrosion Chamber
| Model | SSC-010 | SSC-016 | SSC-020 |
| Internal dimensions (mm) | 800*1450*680 | 1000*1600*800 | 1000*2000*900 |
| Overall dimensions (mm) | 2600×1400×1650 | 2750*1600*1800 | 3150*1600*2100 |
| Interior Volume (L) | 780 | 1280 | 1800 |
| Temperature Range | +10 ℃ ~ +90 ℃ | ||
| Temperature Fluctuation | ± 0.5 ℃ | ||
| Temperature Deviation | ± 2.0 ℃ | ||
| Humidity Range | 30% ~ 98% RH | ||
| Humidity Deviation | + 2%, - 3% | ||
| Salt Fog Deposition | 1~2ml / 80cm2 · h | ||
| SO2 Gas Control | Control and display volume of SO2 gas | ||
| Cooling system | Mechanical compression refrigeration system | ||
| Humidifier | External isolation, stainless steel surface evaporation humidifier | ||
| Air Preheating | Saturated air barrel | ||
| Spraying System | Atomizer tower and Spray nozzles | ||
| Salt Fog Collected | Fog collector and fog measure cylinder | ||
| Sealing | Pneumatic seal | ||
| Controller | Programmable color LCD touch screen controller, Ethernet connection | ||
| Air Circulation | Centrifugal wind fan | ||
| SO2 Exhaust Device | NAOH tank | ||
| Safety Device | Humidifier Dry-combustion Protection; Over-temperature Protection; Over-current Protection; | ||
| Water Shortage Protection; Earth leakage Protection | |||
| Material | Glass fiber reinforced plastics | ||
| Standard Configuration | 8 round bars and 7 V-shaped grooves | ||
Operate Guide of the Salt Fog and SO2 Corrosion Chamber
Before starting, ensure the chamber is installed on a level surface with adequate clearance. Fill the external salt solution tank with prepared brine and verify the water purification system is functional. Use the PID programmable touchscreen controller to select or create the desired test program, set temperature, humidity, SO₂ concentration, and test duration, then start the cycle. Monitor test conditions via the built-in sensors and observation window, and ensure the SO₂ exhaust system is active when the test completes. Always follow safety guidelines, including avoiding flammable or highly corrosive substances, and check that the electromagnetic door lock is engaged before operation.
Video of the Salt Fog and SO2 Corrosion Chamber
Global Assistance You Can Rely On
LIB ensures complete confidence with a 3-year warranty and ongoing lifetime technical guidance. If any issue arises that cannot be resolved on-site, the test chamber will be replaced at no cost. Our expert English-speaking support team is available 24/7 to provide prompt assistance worldwide. Critical spare parts are stocked in international distribution centers for delivery within 7–15 days, and detailed instructions are provided to guarantee safe shipping, installation, and operation of the equipment.